Tozzi Sud S.p.A. has always been alongside the major National and International players for the production/distribution of electricity with the development and construction (on EPC basis) of medium/high voltage electrical sub-stations.
The highest quality standards are applied on all of Tozzi Sud S.p.A.’s projects, thus guaranteeing reliability and high performance and reducing to the minimum maintenance interventions.

Engineering & Procurement

  • Multidisciplinary executive engineering for 15÷20Kv Medium Voltage network works
  • Multidisciplinary executive engineering for 36kV High Voltage network works (Terna new standard)
  • Multidisciplinary executive engineering for 132/150kV High Voltage network works
  • Muldisciplinary executive engineering for the construction of High Voltage substations – Producer
  • Multidisciplinary executive engineering for the construction of High Voltage substations – Terna Std.

Construction

  • Turnkey construction (EPC) of High Voltage substations – Producer
  • Turnkey construction (EPC) of High Voltage substations – Terna
  • Turnkey construction (EPC) of High Voltage substations – Enel
  • Turnkey construction (EPC) of MV power lines
  • Turnkey construction (EPC) of HV power lines